building the pitzer, part six

Pitzer Center UCD
It’s nearly done, the Pitzer Center, the new Music Recital Hall on the UC Davis campus. I’ve sketched this spot since it was the Boiler Building, and watched that old campus character get knocked into the dust, with this finally rising to take its place. It’s nearly done.
Pitzer Center UCD
Here is the front entrance area, now fully glazed. This is what will greet visitors to campus for years to come. I’m looking forward to finally seeing performances there myself.
Pitzer Center UCD
Below, a panorama using pencil. I was thinking about Florian Afflerbach that day, he would have enjoyed to sketch this building. It’s through him that I gained the interest in sketching buildings like this, and using them to really study perspective.

Pitzer Center UCD

Here are the previous chapters: PART FIVE (Feb 2016), PART FOUR (Oct 2015), PART THREE (Aug 2015), PART TWO (Aug 2015), PART ONE (July 2015).