Chemistry Building latest news

chemistry UCD

I have this compulsion to draw the construction projects on campus – it gives me something sort-of new to draw, and I can pretend I have some sort of special purpose or something, like I’m some sort of official documenter of change on this campus, when really I’m just obsessed with filling my sketchbook and find drawing relaxing. When I get a good lunchtime sketch done I feel satisfied and it propels me to be productive for the rest of the day. That’s what I tell myself anyway, but I remember noticing that in times when I was super busy at work, I also got more sketching done in my spare time than at other times of the year. Like in some Januarys, always one of the busiest times of the year, I would be drawing these big panoramas almost daily. Anyway, this is yet another update of the Chemistry Building’s new wing. As I write, the whole thing is now covered in orange. They covered it in green, then in orange, and the end result will be white, so the Irish flag is fully involved in this one. Incidentally, when I was in Scotland I witnessed some of the Orange marches for the first time ever, both in Edinburgh and in Glasgow, that was interesting (but nothing to do with the Chemistry building). I’m not sure when this building’s construction will be fully done, but rest assured there will be a sketch of it posted on this site, because I can’t help myself can I.

You can see the rest of the in-construction sketches of the Chemistry building, and all previous ones pre-reonovation, at: https://petescully.com/tag/chemistry/.